Bemis Bonding Project

Administration Offices and Infrastructure Rehabilitation as Public Art
Commissioned by Bemis Center for Contemporary Arts, Omaha, Nebraska, 2011-12.

This project includes a comprehensive design for the rehabilitation of the administrative offices and library at Bemis. Completed in 2011, the renovated Clare Haas Howard Research Library, included space layout design, table and lighting design and fabrication and shelving modifications. Conceptual design for the rehabilitation of the administrative office, including space design, workstation and lighting design was completed in 2012.

Exterior work was completed in 2011 in conjunction with the Bemis Dock, including guardrail, handrail and lighting design, fabrication and installation. 

An initial installation (see Stations / Fragments in the selected projects section of this site) led to ongoing interactions with Bemis staff including design charettes, conversation and several visiting artist engagements over a two year period, resulting in this comprehensive set of commissions.      
        